Work on the facilities has been completed:
- Reconstruction of technological pipelines and shut-off valves of the Arkron-1000 NS-1 and NS-2 NPS "Gomel"
- Modernization of the Mozyr-Brest pipeline crossing at the intersection with the Mozyr-Brest railway (282km-415m)
- Reconstruction of the underwater crossing of the main oil pipeline "Mozyr-Brest" DN600 and DN800 main km 100-105 and the reserve line DN800 km 103-105 through the Stviga river with the replacement of pipes