Tank farm

LPDS "Mozyr" has a tank farm of 25 tanks of various capacities for oil storage. Structures with a volume of 10,000 to 75,000 cubic meters are divided into reinforced concrete underground tanks and vertical steel surface tanks.

The tank farm has been in operation for more than 50 years. In this regard, JSC "Gomeltransneft Druzhba" is implementing a phased program of modernization of the facility.

  • In 2003, commissioned 2 new reservoirs with a volume of 75000м.cube.

  • In 2007, the technological pipelines were reconstructed in the tank farm.

  • In 2010, 2 new tanks with a capacity of 50000m were put into operation cube.
  • In 2012, 2 more tanks with a volume of 50,000 cubic meters were put into operation, then 2 more such tanks are planned to be built.

  • In 2016, 2 more tanks with a volume of 50,000 cubic meters were put into operation.

  • In 2017, the construction of 4 tanks with a volume of 10,000 cubic meters was started.

  • In 2018, the construction of a tank with a volume of 20,000 cubic meters was started.

Capacity building and updating of the tank farm of LPDS "Mozyr" is the dominant of technical development of JSC "Gomeltransneft Druzhba". The presence of the necessary volume of buffer tanks of the tank farm of the main oil pumping station of the Belarusian enterprise, in case of a possible emergency on any part of the transnational oil pipeline, will ensure the stable operation of the Druzhba oil trunk pipeline system both in Belarus and in Russia, Ukraine and Poland.