2018

Work on the facilities has been completed:

  • Reconstruction of technological pipelines and shut-off valves of the Arkron-1000 NS-1 and NS-2 NPS "Gomel"
  • Modernization of the Mozyr-Brest pipeline crossing at the intersection with the Mozyr-Brest railway (282km-415m)
  • Reconstruction of the underwater crossing of the main oil pipeline "Mozyr-Brest" DN600 and DN800 main km 100-105 and the reserve line DN800 km 103-105 through the Stviga river with the replacement of pipes

2017
Work on the facilities has been completed:

  • Modernization of the Mozyr-Brest main oil pipeline crossing Du 630, 720, 820 at the intersection with the Stolin-Luninets railway (181 km-270 m)
  • Reconstruction of the underwater crossing of the main oil pipeline "Mozyr-Brest" DN 600 and DN 800 main and reserve thread km 199-200 through the Styr river with the replacement of pipes
  • Renovate the Main Oil Pipeline "Unecha-Mozyr" DN 1000 with replacement pipes, PC 158-700-PC 181-19 with the arrangement along the route for 165-176 km
  • Modernization of the Mozyr-MNPP oil pipeline Du 530 mm,720 mm on the PC section 7km-100m-7km-950m, with the arrangement of protective casings at the intersections with the railway PC: km 7km,090, 7km-120, 7km-860

2016

  • Two reservoirs (No 11,12) of 50,000 cubic meters of oil each have been put into operation at LPDS Mozyr .

Work on the facilities has been completed:

  • Reconstruction of the underwater crossing of the main oil pipeline "Unecha-Mozyr" DN800 (main thread) and DN1000 (main thread) through the Sozh river with replacement pipes, km 155-156

  • Reconstruction of the underwater crossing of the main oil pipeline "Mozyr-Brest" DN800 main thread and reserve thread through the Goryn' river with replacement pipes, km 163-164

  • Reconstruction of the underwater crossing of the main oil pipeline "Mozyr-Brest" DN600 (main thread) and DN800 (main thread) through the lake Glinitskoe with replacement pipes, km 49-50

  • Reconstruction of the underwater crossing of the main oil pipeline "Mozyr-Brest" DN 800 main thread through the river Ubort' with replacement pipes, km 59-60

2015

Work on the facilities has been completed:

  • Reconstruction of the underwater crossing of the main oil pipeline Unecha-Mozyr 2DN 1000 main thread through the river Dnipro with replacement of pipes, km 181-188

  • Reconstruction of the underwater crossing of the main oil pipeline "Mozyr-Brest" DN800 main thread and reserve thread through the Goryn' river with replacement pipes, km 163-164

2014

The construction of the heat route from the Mozyrskaya TEC to the Mozyr II boiler room has been completed.

2013

  • The first stage of construction of 2 reservoirs (No11.12) of 50,000 cubic meters of oil each at the Mozyr LPDS has been completed.

  • Reconstruction of technological pumping at theNPS Gomel and NPS Pinsk .

  • Replacing the reserve line of the Unecha-Mozyr oil pipeline with deep-sloping drilling through the Pripyat' river and the Mozyr-Brest oil pipeline through the Ubort' river.

2012

  • The facility was commissioned: "Reconstruction of the main oil pipeline Unecha - Mozyr on the site of the NPS Gomel - LPDS Mozyr. The first phase of the reconstruction. The second launch complex" (crossing the Dnipro river).

  • The construction of the facility has been completed: "Reconstruction of the main oil pipeline Unecha - Mozyr on the site of the NPS Gomel - LPDS Mozyr. The first phase of the reconstruction. Fourth launch complex" (crossing the Sozh river).

2011

  • Construction of two more reservoirs of 50,000 cubic meters of oil each has begun. The task of increasing the volume of the park is urgent, as now the company works with three varieties of oil. Thus, reservoir groups will allow to differentiate oil flows of different varieties.   

  • At NPS Gomel, the pumping station no.1 is undergoing a major reconstruction, such pumping stations already exist at all oil pumping stations of the enterprise and are designed to optimize various technological modes of oil pumping.

2010

  • Two tanks of 50,000 cubic meters of oil each have been commissioned at LPDS Mozyr.

  • The underwater crossings of the main oil pipelines under the rivers of the south of the Belarusian Polesye region have been significantly updated.

2010 was a record for the company in terms of the number of facilities and the volume of work on the reconstruction and construction of the main oil pipeline facilities.

2009

  • The construction of 50,000 cubic meters of tanks continues at LPDS Mozyr.

  • The reconstruction of the power substation is being completed at NPS Gomel. Thus, the electricity supply of all NPS of the enterprise will be modernized.

2007

Construction of new pumping stations at NPS Turov and NPS Kobrin has begun.

2006

  • The LPDS Mosyr has been put into operation pumpingstation number 4/1, equipped with vertical pumps.

  • The construction of the fiber-optic communication line has been completed throughout the main oil pipeline of the enterprise.

2003

  • The construction of loopings has been completed and oil transportation has begun on the third line of the Mozyr-Adamovo oil pipeline.

  • Two tanks with a capacity of 75,000 cubic meters have been put into operation at LPDS Mozyr.

  • The administrative building on the NPS Gomel and the annex to the building of the company's management in Gomel have been put into operation.

1999

  • The program of technical re-equipment of the "Druzhba" to 2010, which aims to improve environmental safety, economic efficiency of the enterprise and improve the well-being of workers, has been approved.

  • 37 kilometers of looping was built for the third line of the Mozyr-Adamovo oil pipeline.


1992

The Gomel department became an independent state enterprise and was renamed the Gomel oil transport company "Druzhba".

1980

The pumping station No.5 of the LPDS Mozyr has been put into operation.

1978

The second stage of the NPS Zascheb'e built by specialists of Poland has been put into operation.

1977

  • The second stage of NPS Kobrin and NPS Turov, built by specialists of Poland, have been commissioned.

  • The second-stage reservoir park and the oil accounting system at the Mozyr LDS have been put into operation.

1975

  • The pumping station No.4 of the LPDS Mozyr has been put into operation.

  • The second phase of the Gomel NPS has been put into operation.

1973

The pumping station No.3 of the LPDS Mozyr has been put into operation.